note:
Putty scraping 1-1.5 square meters per kilogram (two times), each bag scraping 15~20 square meters
Note:
The calculation results for the theoretical estimates, the actual amount and construction methods and other factors, there may be a deviation.
24ServiceNumber
版权所有© 2018 银河6163官方网站下载 津ICP备18003090号